Knitty Keen

Knitting, knitting, and some more knitting

The more things change… January 20, 2016

…the more they stay the same.  I have signed onto yet another Mystery Knit-a-long, this one by a designer new to me called Casapinka.  The shawl is called Welcome Back Garter and looks like it will be interesting based on her other designs.  I won’t be able to start this one for almost a month when funds become available, but I’m sure it’ll be fun.  I’m going to branch out again and use something other than my shawl go-to, Tosh Merino Light.  The colorways just aren’t doing it for me any more so any suggestions for fingering weight yarns would be greatly appreciated.

In other news, I’ve decided to jump on the bandwagon my Facebook knitting group is on and make myself a pair of Rose City Rollers – only using ribbing instead of the rolled cuff which I know would drive me crazy.  I have 60+ grams of Tough Love Sock in Honey Fig leftover from The Doodler and I was going to do a pair of No Purl Monkey socks with the Pistachio for the cuffs, heels, and toes, but I can easily get a pair of anklets out of what’s left of the Honey Fig, and I like wearing ankle socks anyway.  One of my knitting New Year’s resolutions is to knit a pair of socks a month so even though I finished a pair already this month, I’m not really counting them because I started them back in November.

In the land of UFO’s (another resolution) – the Grass and Bubblegum shawl is two inches away from being finished.  Just in time to since I’m going to need it in the cold weather since my scarf has gone missing.  I still have The Desolation of Smaug (yeah, that’s how old it is) Mystery Knit-a-long to finish, two other shawls that need to be blocked, and to finish weaving in the ends (oh so many ends) on my Doodler so I need to get on the ball.  Lots to do until the funds are available for Welcome Back Garter.

I’m also treating myself to a set of Barbara Walker’s stitch dictionaries.  I just got the one with charted designs and it’s very nice.  Some beautiful cable designs – not as pretty as some in the Vogue Knitting Stitchionary but much more practical in my opinion.  I’m hoping for another when my birthday comes along next month, but I’ll have the set before the year is out.

I’ve been staying on top of it, so check the Knitty Keen Facebook page for Work in Progress Wednesday pics and the occasional Finished Object Friday.  Here’s the most recent finished object – my Crazy Zauberball garter rib socks.

DSCF2966

 

TTFN!

Advertisements
 

Should auld acquaintance be forgot… December 30, 2015

It’s the end of the year and while I haven’t knit nearly as much as I would have liked, I did manage to get a few things done.  Here’s what’s been doing recently.

 

The Doodler

This was definitely been a challenge for me.  The cables nearly killed me, I think the biggest one had 34 stitches in it.  Then on clue three I kept messing up my count and having to frog and start all over again.  There was the running out of yarn in clue one and again in clue three I was afraid of it happening again, so I did the fourth wedge in Color A rather than Color C.  Here’s how it’s grown…

DSCF2935

The Doodler Clue 1

the doodler clue 2

DSCF2936

Here’s a pic of it blocking.  I’m still working on weaving in the ends.

DSCF2938

I’m really pleased with the results.  It fits over my shoulders perfectly and I look forward to wearing it in the hopefully chilly days to come.  Sweet Georgia Yarns Tough Love Sock in Honey Fig, Saffron, and Pistachio on US size 4 (3.5mm) needles.

 

Follow Your Arrow 2 Shawl

This one took me quite a long time to get done.  I started out well but then it just sat for a while without being touched.  I still have yet to block it, but here’s a pic of it off the needles.

Follow Your Arrow 2 Shawl

Madelinetosh Tosh Merino Light in Baroque Violet and Grasshopper with US Size 6 (4.0mm) needles.

 

Monkey Jacobus

This one was a year in the making.  Looking back on my project page on Ravelry, I started it on the 23rd of December planning on gifting it on the 25th.  Yeah, right.  Well this year saw me finishing it on Christmas Eve to gift this year.  It was a hit for my nephew who loves monkeys.  Here’s the finished object.

DSCF2953

KnitPicks Stroll Handpainted in Carnival (discontinued color), Palette in Cream and Red, and Stroll Sock Yarn in Black on US size 2 (2.75mm) needles.

 

Grass and Bubblegum Shawl (Color Affection)

This has been languishing in UFO (unfinished object) territory for a while.  I’m going to starting to work on it in earnest again this weekend.  Here’s the most recent in progress pic where you can see how my gauge has changed.  I’m a little afraid to pick it back up again for fear of what my gauge will be this time.

grass and bubblegum shawl

 

Crazy Zauberball Socks

Compared to my other projects, these are practically flying off the needles.  Just finished the gusset on the second sock, so there’s not much left to do before the toe and finishing it off.  Here’s today’s Work in Progress Wednesday picture…

DSCF2962

 

I’m not taking classes this semester so I really want to buckle down and get some knitting done.  I have two sweaters I want to make, two shawls to finish, and I’m aiming for one pair of socks a month this year (although I’m not sure I’ll be able to keep that up come fall with school).  Coming up I’ll be revisiting my review of Chiaogoo needles once I’ve finished my second sock on them and I’m finally going to put in the work and get some patterns published.  Check out the Knittykeen Facebook page to keep up with Work in Progress Wednesday pictures.  I think that’s enough to be working with for now, TTFN!

 

 

Doodling along December 9, 2015

The big project I’ve been working on the past few weeks is Stephen West’s The Doodler mystery knit along.  First snag I hit was running out of color A before I was finished clue 1, so I had to order another skein.

The Doodler Clue 1

Then I went on to clue 2 and all of those cables which took me forever to do because the number of stitches in the cable kept increasing and I’ve never done this type of cable before.

the doodler clue 2

After I finished with the cables I moved on to clue 3.  I had finished 3 wedges of clue 3 and was afraid that I was going to run out of yarn for the last one so I switched to color A for that one.

DSCF2936

I’m about halfway through the last wedge in Clue 3 and then onto the last clue and I’m done.  I’m so looking forward to finishing this and getting it blocked.

While I was waiting for the yarn to arrive to finish clue 1, I found an unopened Jimmy Bean’s package and there was a ball of Crazy Zauberball inside it so I cast on for a sock.

crazy zauberball sock

I’m about 3/4 the way through the heel flap and I have to find my copy of Sock Innovation so I can get the numbers to turn the heel.  I tend to keep this one in my bag so I only work on it in fits and spurts.  Once I’m done The Doodler I’ll work on it in earnest since I really want some wool socks now that the cold weather is here.  I only have another two weeks of school left then I’ll have my days free and I can work on the socks and my hibernating Grass and Bubblegum Shawl.  The only Christmas knitting I’m doing this year is finishing up the second leg of Monkey Jacobus for my nephew which was supposed to be gifted last year.  Not knitting for Christmas this year is liberating in a way, I don’t have to worry about deadlines and whether or not the recipient is going to like it.  If I do Christmas knitting for next year, I’m going to try and be sensible and start in July so I’m not going crazy in the fall since I’ll be in school again.

That’s it for what’s going on at the moment.  TTFN!